Heavy Machinery Transport

Heavy machinery rarely fits on a standard semi-trailer. An excavator runs into the height limit, a grader or paver into the width limit, a tower crane section into the length limit. That is why transport starts not with a per-kilometre price but with the machine’s actual dimensions in transport position.

ETS organises heavy machinery transport between Ukraine and Europe in both directions, and from the USA — by sea to a European port and then by road. We match the lowboy to the specific machine, plan the route around bridges and clearance limits, arrange the permits and take the machinery to its destination. Permits and road charges are already included in the rate.

Or call us — we will work it out on the phone +38 (067) 359-30-88 ·Telegram ·WhatsApp

Describe the machine and route — we will come back with a quote

A manager will contact you within an hour, confirm the model, dimensions and addresses, and suggest the right type of lowboy for your machine.

    What machinery we carry

    The vehicle is chosen by the measured dimensions and weight, not by the machine's name: two excavators of the same weight can travel on different lowboys.

    MachineryWhat makes it oversizedVehicle
    Construction and road — bulldozers, rollers, graders, paversWidth of the blade, drum or screed; cab heightLowboy trailer
    Excavators — crawler, wheeled, backhoe loadersBoom height in transport position, track width, weightLowboy; modular platform for the heaviest
    Tower cranesLength of tower and jib sectionsExtendable trailer, several trucks per crane
    Tractors and farm machinery — tractors, towed implements, grain cartsWidth across the wheels, cab heightLowboy trailer
    Combine harvestersAll three dimensions at onceLowboy, header shipped separately

    Construction and road machinery

    Bulldozers, rollers, graders and pavers — most often oversized by the width of the blade or drum.

    Excavators

    Crawler, wheeled and backhoe loaders. What decides is the height in transport position.

    Tower cranes

    Shipped in sections on several trucks, with a route approved for each section.

    Tractors and farm machinery

    Tractors, towed implements, grain carts. Combines have their own page.

    Construction and road machinery

    Bulldozers, rollers, motor graders and pavers are most often oversized by width. A bulldozer blade or a roller drum is wider than the permitted 2.6 m in Ukraine and 2.55 m in the EU, and that alone requires a permit, whatever the weight.

    Self-propelled machinery drives onto the deck under its own power, so the loading site needs room for the lowboy and the ramp. Removable attachments are prepared for transport by the owner in advance — this decides whether the machine fits within one permit or needs another.

    Excavator transport

    An excavator is a typical height-oversized load. Height is measured not from the data sheet but in transport position: boom folded, bucket lowered, plus the height of the lowboy deck. That total has to fit within the permitted 4 metres, and that is where the gap between the specification and reality most often hides.

    • Crawler excavators — heavier and wider; they travel on a lowboy, the heaviest on a modular platform where axles are added to match the weight.
    • Wheeled excavators and backhoe loaders — lighter, but because of cab and boom height they also often need a low deck.

    For a quote we need the model, actual weight and dimensions in transport position — with the bucket removed or fitted, as the machine will travel.

    Tower crane transport

    A tower crane does not travel as one load. It is shipped in sections — tower, jib, counterweights, base — each with its own dimensions and its own route approval. So a crane means several trucks, and the quote covers the full set, not a single section.

    Long sections travel on an extendable trailer whose deck is extended to the length. Dismantling and erection are done by the owner or an erection contractor — we collect the sections prepared for loading and deliver the full set to the site.

    For a quote we need a list of sections with the dimensions and weight of each — it is usually in the manufacturer's documentation.

    Tractors and farm machinery

    Tractors, towed implements and grain carts are oversized by width across the wheels and cab height. Like construction machinery, a tractor drives onto the lowboy under its own power.

    Combines have their own page: preparation works differently — the header usually travels as a separate piece, and the combine itself is often oversized in all three dimensions. More on combine transport.

    Heavy machinery routes and transit times

    RouteTransit time
    Germany → Ukrainefrom 4 days
    Poland → Ukrainefrom 3 days
    Netherlands → Ukrainefrom 4–5 days
    United Kingdom → Ukrainefrom 5 days
    Ukraine → Romaniafrom 3–4 days
    Ukraine → Spainfrom 6–7 days
    USA → Ukraineon quote

    Transit times are for routes without detours. If the dimensions require bypassing bridges or night driving with an escort, delivery takes longer — and this is clear at the route approval stage. ETS does not carry domestic shipments within Ukraine: we work on international routes and, as part of the trip, deliver the machinery to its final address in Ukraine.

    Heavy machinery from the USA

    Machinery from the USA travels by sea: through the ports of New York and New Jersey to a European port — most often Gdańsk or Gdynia, and depending on the route also Rotterdam or Klaipėda. Then by road to Ukraine, where everything works the same as from Europe: measurement, a lowboy matched to the dimensions, route approval and permits.

    Compact machinery — mini excavators, loaders, small tractors — often fits in a 20- or 40-foot container. A machine that does not fit in a container is a separate task: we quote it for the specific dimensions, port and line.

    Sea transit time depends on the port of departure, the port of arrival and line capacity, so we give the exact time in the quote. More about the route on our shipping from the USA page.

    How heavy machinery transport is organised

    Heavy machinery does not take the shortest route. The route is planned around the machine’s actual dimensions together with the lowboy deck: overpass heights, lane widths, permitted bridge loads. That is why the sequence is always the same — measurement first, then route approval, and only then a loading date.

    Export clearance takes place in the country of departure or transit, and import clearance in the country of destination: in Ukraine, at a location chosen by the customer, and for machinery leaving Ukraine, in the country of delivery. The border crossing is chosen to fit the route: for example, Yahodyn or Krakovets on the Polish route and Uzhhorod on the Hungarian one.

    How long preparation takes

    StageTimeWhat happens
    Measurement and quote1 working dayUsing the model, actual dimensions, weight and addresses, we choose the lowboy and calculate the cost
    Route approvalfrom 3 daysThe application is submitted at least three days before transport. If the route crosses several regions, it goes directly to the Restoration Agency
    Movement permitafter approvalIssued by the authorised unit of the National Police through an administrative service centre. For trips leaving Ukraine — by the Patrol Police Department
    Transportfrom 3 daysDepends on the route, detours and the need for an escort

    How much heavy machinery transport costs

    There is no fixed per-kilometre rate. The cost is made up of four parts:

    • measured dimensions — each excess of the permitted height, width or length requires a separate permit;
    • route — the countries on the way, detours, bridges and tunnels; for machinery from the USA, also the sea leg;
    • type of lowboy — a lowboy, an extendable trailer and a modular platform are priced differently, and a tower crane means several trucks;
    • escort — whether one is needed is decided by the dimensions, not by the customer's preference.

    Permits and heavy-vehicle road charges are already included in the rate — you get an agreed price and do not pay for them separately.

    For a quote we need the machine model, actual dimensions in transport position, weight, loading and unloading addresses and the customs clearance location. We reply with a quote within one working day.

    Documents and customs

    Moving heavy machinery across the border — into or out of Ukraine — involves two processes that run in parallel: route approval with oversize permits, and customs clearance. ETS takes care of the first in full. The second is handled by a customs broker, and we coordinate so the machinery does not get stuck between the two.

    What the client prepares

    • Model, actual dimensions and weight — in transport position
    • Technical data sheet or specification
    • Machinery prepared for transport: attachments removed, crane in sections
    • Loading and unloading addresses with a description of site access
    • Customs clearance location — in Ukraine or in the country of delivery

    What ETS takes care of

    • Choosing a lowboy for the machine's parameters
    • Route approval and oversize permits
    • Arranging an escort, if the dimensions require it
    • Coordinating export and import clearance with the broker
    • Transport documents and CMR insurance of €200,000–250,000
    ETS does not carry out customs clearance — we are not a customs broker, but we coordinate the process and can recommend a broker if needed. The parameters that make a load oversized, and the fines, are covered in our article on traffic rules.

    What to consider when shipping heavy machinery

    Height in transport position

    The machine's data-sheet height and its height on the deck are different numbers. The difference is the height of the lowboy deck itself — and that decides whether a height permit is needed.

    Loading site

    A lowboy is longer than a standard truck and needs room to approach and turn. Self-propelled machinery drives onto the deck under its own power; non-self-propelled machines are lifted on by crane. How exactly the machine goes on and whether the lowboy can reach the site is confirmed before the quote.

    Scheduling in wartime

    Carriers often send a lowboy for loading only after prepayment. The schedule then runs from the date the payment clears, not the date of the request — and this is worth building into the timeline.

    A common mistake

    Dimensions are taken from the specification — without attachments, protruding parts or the height of the lowboy deck. The mismatch shows up at loading: the permit was issued for different parameters, the lowboy is waiting, and waiting time over 48 hours is charged per day. Measuring the machine before the quote costs less than one day of such downtime.

    ETS - European Transport Systems

    Calculate the transport cost

    Since 2011 we have been moving loads of any complexity between Ukraine and the countries of Europe and Asia. For your convenience, we built this freight cost calculator. 

    The minimum shipment for your cargo starts at 100 kg or 1 m3.

    We cannot help with household moves or delivery of personal belongings.

    Fill in the form and get a detailed quote quickly!

      ETS case: machinery transport

      Italy → Ukraine

      A 28-tonne combine from Italy to the Cherkasy region on a lowboy

      Client: PE "Ahrospetsproekt".

      The task. Deliver a combine from near Modena (San Felice sul Panaro) to the village of Velyka Burimka in the Zolotonosha district, with customs clearance in Kyiv. February 2024.

      The load. A combine measuring 12 × 3.49 × 3.99 m, 28 tonnes gross — oversized in all three dimensions and too heavy for a standard semi-trailer.

      The solution. A lowboy trailer from our Polish carrier partner. Route: Italy → export clearance in Hungary → Uzhhorod border crossing → customs clearance in Kyiv → delivery to the Cherkasy region.

      What made it different. The war changed the terms rather than the route: the carrier released the truck only after prepayment, so the schedule ran from the payment date, not the request date.

      The result. The combine was delivered to the Cherkasy region in spring 2024.

      More about combine transport →

      Frequently asked questions

      How much does heavy machinery transport cost?
      There is no fixed rate: the price depends on the actual dimensions, weight, route, type of lowboy and whether an escort is needed. Send us the model, dimensions and addresses — we will reply with a quote within one working day.
      Are permits and road charges included in the price?
      Yes. All related costs of permits and road charges are included in the rate. You do not pay for them separately.
      How is an excavator transported?
      On a lowboy; the heaviest on a modular platform. Height is measured in transport position together with the deck — it decides whether a height permit is needed.
      Do you transport tower cranes?
      Yes. A crane travels in sections on several trucks, with a route approved for each. Dismantling and erection are done by the owner or an erection contractor — we deliver the prepared sections.
      Do you ship heavy machinery from the USA?
      Yes. By sea to a European port — most often Gdańsk or Gdynia — and then by road to Ukraine. Compact machinery often travels in a container; a machine that does not fit in a container is quoted for the specific task.
      Do you remove attachments or dismantle machinery?
      No. The owner prepares the machinery for transport: removes attachments, folds the boom, takes the crane apart into sections. We choose the vehicle for the way the machine will travel and carry it.
      How long does preparation take?
      The quote takes one working day after we receive the dimensions. Route approval takes from three days. We give the exact loading date after approval.
      Do you transport heavy machinery within Ukraine?
      ETS does not carry separate shipments within Ukraine. We work on international routes and, as part of such a trip, deliver the machinery to its final address in Ukraine.

      Let us quote your machinery transport

      Send the model, dimensions, weight and loading and unloading addresses — we will reply with a quote and a recommendation on the lowboy type and route.

      Send a request

      Related services